Data center work breakdown structure jobs

Filter

My recent searches
Filter by:
Budget
to
to
to
Skills
Languages
    Job State
    18,322 data center work breakdown structure jobs found, pricing in AUD

    We wo...with the workbook. The summary page is set at A4 portrait, but the other tabs are all Landscape and we would like these to be Portrait - this may mean that some of the breakdown boxes will have to be moved. The tables need to be the same size (sitting on top of each other) and the font/typeface needs to be the same throughout the workbook.

    $59 (Avg Bid)
    $59 Avg Bid
    24 bids

    I need a logo, then a line of text centered about the navigation on our website. Line of text: A division of Limestone Coast Work Options Inc. Please see uploaded file.

    $26 (Avg Bid)
    $26 Avg Bid
    43 bids

    I need creative and professional graphic designer to create a brochure for a medical center. I will attach the logo, the required details and another related materials. I need it tri-fold brochure design.

    $38 (Avg Bid)
    Guaranteed
    $38 Avg Bid
    4 entries

    ...conducting interviews. If you think that you or your team will be the right fit please place a bit and apply for our team! Details: **very fun industry and company to work with** ! >Travel industry< 1) Out going and friendly personality 2) Attention to detail 3) Ability to follow direction 4) Multi Tasking ability 5) Chat support

    $9 / hr (Avg Bid)
    $9 / hr Avg Bid
    28 bids
    Action Center 6 days left
    VERIFIED

    Blue prints for a 7 story building (ground and 6 above ground floors) and a roof The lot is rectangular measuring 40.0 meter x 21.5 meter for a total of 860 Square meter. The two underground levels to be constructed over the full area of 860 m2 of the lot whereas the 7 floors (ground and 6 above floors) would have an area of 758.5 m2. The area is reduced to allow for air and light at two sides o...

    $319 - $957
    Local
    $319 - $957
    0 bids

    ...(1), (2), (3), (4) and optionally (5) • Timelines of (1), (3) and (4) • Approximate traffic (genuine effective traffic) within 2 months or 4 months period. • Prices with breakdown of each item/activity, Fixed price for (1), (3), (4) and price/month for (2). Mention if the price includes Ad price (Bit Media, Facebook or Google) and your services fee

    $425 (Avg Bid)
    $425 Avg Bid
    17 bids
    Make a single center div 6 days left
    VERIFIED

    I have a webpage that has current 3 equal spaced div's that I want to have just one div that has the same width as the 3. This way I can put a grid into that div but my left and right div's will stay the same. You can see the page at [url removed, login to view] I want one div with a blue header with the word Membership centered in the blue.

    $28 (Avg Bid)
    $28 Avg Bid
    23 bids

    I eed data center build specialist who has good experience in Building Tier 3 data center. He is required to assess and audit an existing data center in West Africa and come with gap report. Also help the client get a tier 3 certification.

    $6381 - $12762
    $6381 - $12762
    0 bids
    call center 6 days left

    Dar apoyo al área de ventas, responder inquietudes, asesorar a cerca de un producto determinado, dar información sobre tiempos de despachos, requisitos para una garantía, información sobre horarios y lugares de atención.

    $40 (Avg Bid)
    $40 Avg Bid
    31 bids

    Similar to this AD, [url removed, login to view] but the name of the review center is BRAADD Maritime Review Center

    $98 (Avg Bid)
    $98 Avg Bid
    10 bids

    ...highlight their services. Pay Total: £300 Pay Breakdown: 40% on Project Partial Sign off stage (This is when we have received the initial build from you and then sent it to our client for review) 60% on completion of the website (This is when the website is launched and our client is happy with the work) Project Partial Sign Off Deadline: 24 Hours

    $496 (Avg Bid)
    $496 Avg Bid
    44 bids
    Build a WordPress Website WFT 6 days left
    VERIFIED

    ...highlight their services. Pay Total: £200 Pay Breakdown: 40% on Project Partial Sign off stage (This is when we have received the initial build from you and then sent it to our client for review) 60% on completion of the website (This is when the website is launched and our client is happy with the work) Project Partial Sign Off Deadline: 24 Hours

    $330 (Avg Bid)
    $330 Avg Bid
    54 bids

    ...highlight their services. Pay Total: £300 Pay Breakdown: 40% on Project Partial Sign off stage (This is when we have received the initial build from you and then sent it to our client for review) 60% on completion of the website (This is when the website is launched and our client is happy with the work) Project Partial Sign Off Deadline: 1-2 days

    $546 (Avg Bid)
    $546 Avg Bid
    60 bids

    CALL CENTER - Terminvereinbarung ich suche eine Zuständigen Freelancer im ebrreich Call Center

    $1030 (Avg Bid)
    $1030 Avg Bid
    2 bids

    Hi PRINJAL PROJECT CENTER, I noticed your profile and would like to offer you my project. We can discuss any details over chat.

    $38 (Avg Bid)
    $38 Avg Bid
    1 bids

    ...different countries. You can use Google to see them. We also have an iOS app which displays the news from these sites. You can search it on the Apple iTunes store. DEVELOPMENT WORK REQUIRED We would like to use push notifications so that our journalists can send breaking news alerts to users of our app. This feature was already half-way developed

    $1854 (Avg Bid)
    $1854 Avg Bid
    122 bids

    ...able to share the existing page domain name, wireframes for membership site, and information to setup payment integration and email autoresponders. Here is a detailed breakdown of the deliverables I need completed: - Take an existing domain name purchased on Squarespace and transfer it to Namecheap cPanel - Migrate client's current Squarespace

    $263 (Avg Bid)
    $263 Avg Bid
    8 bids

    ...sites, carts and checkout systems to complete this project. DEADLINE = 05.10.17 (AEST) BUDGET = $1250 AUD (if completed on time.) Please see zip file for Milestone Breakdown. The task list supplied is not the entire project, please also use the screen designs to ensure this site looks great. We will be available everyday to help you as much

    $1198 (Avg Bid)
    $1198 Avg Bid
    33 bids

    ...each student that opts to sign up. I'll need it to have packages and purchases for each course. We'll be teaching three different instruments. Please tell me the price breakdown for something like this. I'd like it to have specific features such as: 1. Disable users from downloading videos. 2. Disable multiple account logins simultaneously. 3

    $1030 (Avg Bid)
    $1030 Avg Bid
    65 bids

    looking for native english speaking to write for me a nbeauty medical center text i m looking for a person writing not a company

    $125 (Avg Bid)
    $125 Avg Bid
    34 bids