Project number critical paths jobs

Filter

My recent searches
Filter by:
Budget
to
to
to
Type
Skills
Languages
    Job State
    14,746 project number critical paths jobs found, pricing in AUD

    A Wordpress Page that generates Inventory Numbers as described in the PDF.

    $204 (Avg Bid)
    $204 Avg Bid
    41 bids

    ...Video Poker (same developers, same code, same sound asset) and replacing the one in Draw 4. Still gets stuck (so it’s not the file that’s corrupted or something). Changing the paths to the sound files (such as: ./sounds ../sounds /sounds) as well as putting the sound files in the JS folder (and making the path just [login to view URL] with no path). Since this

    $42 (Avg Bid)
    $42 Avg Bid
    2 bids

    ...owner of the phone number scraped etc... If you can't do anything else from the project, except this then you will have made me very happy already. THE PROGRAM MUST BE ABLE TO EXTRACT USERNAMES/MOBILE NUMBERS FROM TELEGRAM CHANNELS THAT I'M NOT THE ADMIN OFF. THIS IS THE MOST IMPORTANT FEATURE (I WON A DISPUTE ON THIS PROJECT HERE ALREADY DUE TO

    $94 (Avg Bid)
    $94 Avg Bid
    1 bids

    ...owner of the phone number scraped etc... If you can't do anything else from the project, except this then you will have made me very happy already. THE PROGRAM MUST BE ABLE TO EXTRACT USERNAMES/MOBILE NUMBERS FROM TELEGRAM CHANNELS THAT I'M NOT THE ADMIN OFF. THIS IS THE MOST IMPORTANT FEATURE (I WON A DISPUTE ON THIS PROJECT HERE ALREADY DUE TO

    $334 (Avg Bid)
    Featured
    $334 Avg Bid
    7 bids

    I am looking for someone to put together a list of names, titles, and contact information for individuals in specific roles at non-profit organizations in the United States. I have about 1,000 organizations I need contact information for.

    $492 (Avg Bid)
    $492 Avg Bid
    36 bids

    Complete and edit a 2000 word critical analysis paper on religious approaches to issues of environmental degradation and nature. Sources and argument are provided and stated, and further information will be provided via direct messaging.

    $46 (Avg Bid)
    $46 Avg Bid
    22 bids
    Draw 4 sounds 5 days left

    ...Video Poker (same developers, same code, same sound asset) and replacing the one in Draw 4. Still gets stuck (so it’s not the file that’s corrupted or something). Changing the paths to the sound files (such as: ./sounds ../sounds /sounds) as well as putting the sound files in the JS folder (and making the path just [login to view URL] with no path). Since this

    $46 (Avg Bid)
    $46 Avg Bid
    2 bids

    i have an website which is currently working fine but i want to integrate sms and email verification on registration page

    $20 (Avg Bid)
    $20 Avg Bid
    6 bids

    ...holding paper; hand must exist behind paper. • Colour space must be RGB. Not CMYK. • Gradients break. unless flattened to the layer or merged • Strokes/ paths have to remain single width paths if going to be stroked in animation. (width tool will break this) • New boards and added assets must be designed & provided. (unless very simple text changes

    $224 (Avg Bid)
    $224 Avg Bid
    13 bids

    We need a SW module that Getting איק images from whatsup and the phone number that send the images

    $712 (Avg Bid)
    $712 Avg Bid
    11 bids

    ...[login to view URL] functions and loads app domain/[login to view URL] functions and loads app domain/about does not function, shows ci 404 I have tried adding as a folder /about/ but app paths get messed up since it's in a lower directory and I have tried multiple .htaccess solutions with no luck. Looking for about 20 hours of work to see how things go and will

    $613 (Avg Bid)
    $613 Avg Bid
    98 bids

    I need someone to install/write the software and configure the hardware for a device that will capture the cell phone numbers of all nearby cell phones. This link shows instructions on one way to accomplish this. [login to view URL]

    $6708 (Avg Bid)
    $6708 Avg Bid
    8 bids

    a big project for it company to be accepted as a possible applicant you will need to compete creating a simple under 200 lines code faster or better than the others

    $1737 (Avg Bid)
    $1737 Avg Bid
    21 bids

    I am looking for US Realtor records that include phone number. I need up to date information. I can get this information elsewhere quite cheap, do not post stupid high prices.

    $136 (Avg Bid)
    $136 Avg Bid
    26 bids

    Hello I have some of images you should detect car license platenumber from image. i can send you example image Bid if you already made or exp. This should be run on linux. .....................

    $241 (Avg Bid)
    $241 Avg Bid
    40 bids

    The project involves building a rapid prototype proof of concept, that simulates a limited real world scenario with interactions such as : - Ability for objects to follow paths - Gravity affecting objects of differing mass - Collision detection and notification - Objects on paths responding to other objects signals on the paths - Continual logging

    $48 / hr (Avg Bid)
    $48 / hr Avg Bid
    27 bids

    - Develop a database to contain our telephone number (TN) inventory - Build the database to also contain the TN validation criteria (such as PIN, account number, and more) - Setup API software that can communicate with my database and my vendor's API - Create a URL for my API

    $588 (Avg Bid)
    $588 Avg Bid
    3 bids

    hello. We want to use indian website, but need indian mobile phone to verify account. So I want you to receive OTP number by SMS to sign up.

    $31 (Avg Bid)
    $31 Avg Bid
    12 bids

    I have a photo of 45 boxes that have an address label and a tracking number attached I need a spreadsheet with two columns; one column to have the name and the other column to have the tracking number from each of the 45 images

    $19 (Avg Bid)
    $19 Avg Bid
    60 bids

    Hi...Voice Number Setup. Someone in the US could do it easily since Google Voice Numbers are only available for US. You just need to create and email acc from USA and claim a Google Voice Number for free by verifying your USA phone number. And it is done. getting Google Voice Number is free of charge. I will pay u commission to get me the number.

    $21 (Avg Bid)
    $21 Avg Bid
    2 bids

    I have a small app that uses a view pager, recycler view and fragments. The recycler view loads data from an XML source. Problem is that some times the recyclerview does not update. I need someone to fix this. Please. I need it in 2-3 hours at most. Small job so pays $15

    $21 (Avg Bid)
    $21 Avg Bid
    3 bids

    You need the program Microsoft Project to complete this and know critical path and other methods in project management.

    $18 (Avg Bid)
    $18 Avg Bid
    5 bids

    ...which will keep on adding new worksheets or deleting existing one. The current VBA code, creates a table of content, with the page number for each worksheet. However instead of the page number, I need the first page number of the print preview page for each worksheet. Attached is the excel sheet, and in the cover worksheet, I have shown the correct and

    $22 (Avg Bid)
    $22 Avg Bid
    3 bids

    Need a python or C++ developer to create an ANPR (Automatic number plate reader) system for Indian number plates. Check this code on Git hub. [login to view URL] 1. Make it work with live RTSP video feed and with saved video file 2. Need to optimise it for Indian Plates. Need atleast 80 tp 90% accuracy.

    $277 (Avg Bid)
    $277 Avg Bid
    8 bids

    We are a fashion photography and Videography agency that needs a bit of help. We have around 600+ images in a month that we need clipping paths, retouching, clean up, resize, ...etc. We are looking for someone with a team of retouchers that can do a quick turnaround time, good quality and very reasonable price. Thank you

    $448 (Avg Bid)
    $448 Avg Bid
    62 bids

    Hi...Voice Number Setup. Someone in the US could do it easily since Google Voice Numbers are only available for US. You just need to create and email acc from USA and claim a Google Voice Number for free by verifying your USA phone number. And it is done. getting Google Voice Number is free of charge. I will pay u commission to get me the number.

    $28 (Avg Bid)
    $28 Avg Bid
    2 bids

    ...being shot, stabbed, and beaten and left for dead while working as a bounty hunter. How God kept me safe, and gave me the strength to drive on. How I fell in love changed life paths by giving up the dangerous career to start a family; only to later have not one hemorrhagic stroke, but two; the second of which left me immobile for nearly a year of my life

    $11910 (Avg Bid)
    Local Featured
    $11910 Avg Bid
    3 bids

    I need you to fill in a spreadsheet with data.

    $3 / hr (Avg Bid)
    $3 / hr Avg Bid
    85 bids

    I'm worried about my daughter who keeps running off with bad sorts. This weekend she hasn't come home. Her phone is ringing but she won't pick up. I can't keep going to the police because they just see us as serial pests. I can't stop worrying about her. I just want to know where she is so I can go pick her up.

    $26 (Avg Bid)
    $26 Avg Bid
    2 bids

    I need my website re-configured.I need you to build it. I want to add phone number in registration form and receive data.

    $37 (Avg Bid)
    $37 Avg Bid
    33 bids

    Need someone to help me for 10~20 mins. One of the easiest jobs. Requirement: You need to have a phone to call at least. That's all. Happy bidding!

    $43 (Avg Bid)
    $43 Avg Bid
    5 bids

    I need python script to find Missing number in a txt file

    $32 (Avg Bid)
    $32 Avg Bid
    16 bids

    The first task is to compress an XML file (between 70-80GB) which contains data from cars in Denmark to a smaller file, in order to only get data that is needed or reduce the file, size this file is renewed monthly with new data, i.e. you need to Make a system to be able to renew it also on the site [login to view URL], plus make a search engine for license plates The point is to type in the custo...

    $757 (Avg Bid)
    $757 Avg Bid
    23 bids

    ...multipage gravity forms survey. On the last page the user is asked for zip code. At that position the coursor should be placed in that field at page load. On mobile devices a number pad shall be shown. I has to work on all mobil devices. On desktop the cursor shall blink in the field (e.g. [login to view URL]) The solution should be really simple. Not a big plugin

    $42 (Avg Bid)
    $42 Avg Bid
    18 bids

    I would like to recruit an SEO freelancer to ensure i can rank above my main competitors in my niche. My website is [login to view URL] I would like to rank above my main competitor for about 10 -15 keywords. I already rank on Page 1 of Google but my site needs a final push to rank at the google # 1 spot I would like to hear bids on how this can be achieved after the sites have been reviewed pl...

    $146 (Avg Bid)
    $146 Avg Bid
    83 bids

    I am looking to have a device made (or software with the necessary hardware counterpoint) that will capture the cell phone numbers of anyone within a few hundreed meeters of the device. These numbers will then be stored in a database (csv file) for future use.

    $1898 (Avg Bid)
    $1898 Avg Bid
    5 bids

    Writing a topic about critical thinking contains a Issue and two sides one side agree another one disagree And written support for each side And then write the conclusion and answer nine related questions For more information please submit an offer and ask for anything unclear

    $148 (Avg Bid)
    $148 Avg Bid
    31 bids

    Hi there, I'm looking for someone who can reproduce a logo and deliver: -AI, EPS and PDF -All art and fonts saved as outlines/paths -Colours specified as Pantone/PMS codes I'm going to provide a reference image once the offer gets accepted I look forward to hearing from you Regards, Jacob

    $25 (Avg Bid)
    $25 Avg Bid
    48 bids

    We're having lots of GA issues tracking revenue on WooComm because of return paths not coming back on site, we need an alternate solution involving the measurement protocol to be implemented. Thanks, Nitesh

    $247 (Avg Bid)
    $247 Avg Bid
    11 bids

    Following a process to search and record email, phone number, and address from websites. The correct candidate needs to be diligent and detail-oriented.

    $139 (Avg Bid)
    $139 Avg Bid
    129 bids

    ...what needs to be designed into 2. do the keyword research and get all the content done 3. Market my website for 6 months to get to number 1 on google with certain keywords 4. do blogs, pr etc etc This is an ongoing project and will be paid bonuses on results hit. We have our own seo team in house and web developers. Want to try outsourcing for once

    $1367 (Avg Bid)
    $1367 Avg Bid
    60 bids

    Call a number and record asking for the person by name in order to verify the number.

    $178 (Avg Bid)
    $178 Avg Bid
    9 bids
    Trophy icon nomnom Brand logo design 1 day left

    ...business that supports other businesses. The idea of the project stemmed from this passion to encourage creativity, thinking outside the box, and a great enthusiasm for entrepreneurship. What does nomnom represent? Being creatively active seeking new ideas Exploration Walking on new paths Trying new shoes / adventurous Finding a calling

    $347 (Avg Bid)
    Featured Guaranteed Sealed NDA
    $347
    215 entries

    ...Formatting HTML Quotations HTML Comments HTML Colors HTML CSS HTML Links HTML Images HTML Tables HTML Lists HTML Blocks HTML Classes HTML Id HTML Iframes HTML JavaScript HTML File Paths HTML Head HTML Layout HTML Responsive HTML Computercode HTML Entities HTML Symbols HTML Charset HTML URL Encode HTML XHTML HTML Forms HTML Form Elements HTML Input Types HTML

    $581 (Avg Bid)
    $581 Avg Bid
    18 bids

    We need a Survey Funnel to qualify leads. It contains 7 questions with 3 diferents paths. I will provide the workflow, images, and guidances. Please say "hola" to check that you are not a robot.

    $175 (Avg Bid)
    $175 Avg Bid
    8 bids

    is the small task ever! fast and good. change number at photo (photo edit)

    $15 (Avg Bid)
    $15 Avg Bid
    33 bids

    ...started, the individual goes to the binder and takes the next unassigned job number and writes down the job details next to the job number. Each individual’s binder has a different range of numbers so that no two users might use the same number. The goal of this project is to do away with the 3-ring binders and provide a single on-line “binder” th...

    $853 (Avg Bid)
    $853 Avg Bid
    34 bids

    hi, we need a clickable phone number and we need this today

    $15 (Avg Bid)
    $15 Avg Bid
    65 bids

    ...display strings on an LCD accordingly, with certain stipulations. The flow is currently working, but needs additional functionality. Upon deploy, it creates an array of file paths that it finds in a certain directory (thumb drive). I would like for it to dynamically generate user interface items based on this array, creating a button for each element

    $28 / hr (Avg Bid)
    $28 / hr Avg Bid
    23 bids