Quantity Surveying Jobs

Filter

My recent searches
Filter by:
Budget
to
to
to
Type
Skills
Languages
    Job State
    7 jobs found

    I have a set of plans ready and need a focused assessment completed exclusively in PlanSwift within the next three days. The job is straightforward: open my files in PlanSwift, run a full construction estimate, and return the numbers in the exact templates I will supply. What I’m looking for inside the software is clear: • Labour cost take-off • Material cost take-off • Consolidated overall project cost You’ll receive my spreadsheet and report layouts up front, so all figures must drop straight into those fields without altering the format. Deliver the native PlanSwift file plus a PDF summary exported directly from the program so I can review and hand it to the client immediately. Only bid if you already work comfortably in PlanSwift; there’s no tim...

    $9 - $22
    Sealed NDA
    $9 - $22
    0 bids

    I have a set of plans ready and need a focused assessment completed exclusively in PlanSwift within the next three days. The job is straightforward: open my files in PlanSwift, run a full construction estimate, and return the numbers in the exact templates I will supply. What I’m looking for inside the software is clear: • Labour cost take-off • Material cost take-off • Consolidated overall project cost You’ll receive my spreadsheet and report layouts up front, so all figures must drop straight into those fields without altering the format. Deliver the native PlanSwift file plus a PDF summary exported directly from the program so I can review and hand it to the client immediately. Only bid if you already work comfortably in PlanSwift; there’s no tim...

    $22 - $186
    Sealed NDA
    $22 - $186
    2 bids

    Title: GRC + MS Structure Estimation Required (BOQ, MS Weight, Installation Costing) Project Description: I need an experienced estimator who has worked with GRC (Glass Reinforced Concrete) façade systems and MS structural support structures. The task is to prepare a complete cost estimate and BOQ for a GRC façade supported on MS framing. Scope of Work: Calculate GRC quantities (sqm) Calculate MS support structure weight (kg) Identify bracket, anchor and fixing quantities Estimate installation labour cost for GRC and MS Include scaffolding cost based on height Provide rate analysis (material + labour) Prepare final BOQ in Excel Provide a summary sheet suitable for client quotation Required Experience: GRC panels, jalis, cornices, moulded elements MS RHS/SHS/a...

    $176 Average bid
    $176 Avg Bid
    8 bids

    I have a set of oil-pipeline isometric drawings in PDF that need to be fully weld-mapped and auto-spooled. From each sheet I must be able to pull a complete Material Take-Off, exact cut lengths, joint details, and a spool-wise BOQ that I can forward directly to procurement and fabrication. The workflow you propose is important to me, so please outline in your proposal how you intend to import the PDFs, generate intelligent weld numbers, split the line into logical spools, and export the data. Mention the software you will rely on—whether that is Spoolgen, Autospool along with any custom scripts or macros you plan to use. Deliverables • Clean weld-mapped isometric PDFs (showing weld numbers and spool number) • Native files from your chosen platform • Excel or CSV ...

    $696 Average bid
    $696 Avg Bid
    10 bids

    I have a complete set of architectural drawings and I need an accurate material take-off prepared from them. The scope is limited strictly to what appears on those architectural sheets—no structural, plumbing or other disciplines—so your focus will be on reading plans, elevations, sections and details to capture every relevant item. Your task is to measure and tabulate the material quantities for: • Brickwork (including any parapets or feature walls) • Internal and external plaster • All tiles called for in the finishes schedule (floors, walls, skirtings) • False ceiling areas • Paint, broken down into internal and external surface areas Please provide the results in a clear spreadsheet (Excel or Google Sheets) showing take-off notes, unit o...

    $23 Average bid
    $23 Avg Bid
    6 bids

    I have civil and interior works coming up in an industrial setting and I need a sharp set of eyes on both the numbers and the paperwork. Your main tasks are twofold: • Budget estimation – I will send you drawings, specs, and any existing take-offs. I need you to develop a complete cost breakdown: labour, materials, prelims, contingency and mark-ups, all clearly organised in Excel (or CostX if you prefer) so I can track every rupee. Highlight any value-engineering opportunities you spot along the way. • Tender preparation – Using the same data set, prepare the full tender package: BOQ, rate analysis, commercial terms, clarifications, and any schedules normally demanded by industrial clients. The end file should be submission-ready and formatted to match the employer...

    $30 Average bid
    $30 Avg Bid
    4 bids
    $560 Avg Bid
    17 bids

    Recommended Articles Just for You