Before you bid:
[login to view URL] must be an expert in DFD or well known about it and how finish it perfectly with no errors.
[login to view URL] must finish it in 8 hours at most and the earlier you finish it I will provide a bonus if done perfectly.
- I have uploaded the assignment for developing Data Flow Diagram (DFD).
- It has two problems.
- For each problem please develop CONTEXT DFD and Level-0 DFD
- you must understand the problem very well so you can develop right and accurate diagrams.
- please read the attachment file before you are confident to develop the assignment.
- I know it is simple because I don't have time but I wanted as an accurate as possible.
***** I provide my past project which was simple for me and I want you to use the same format in terms of Icons and and number and how it should look like. I uploaded the example as an image file which is Context and Level-0 Diagram.
I am computer system engineering graduate. I have ample experience of developing Context diagrams, data flow diagrams, use case narratives etc.
I can complete the assignment.