Power-Aware Optimized RRH to BBU mapping in C-RAN

Closed Posted 5 years ago Paid on delivery
Closed Paid on delivery

The main objective of this project:

1- Find an optimal policy that controls the power of the RRHs and BBUs in cloud radio access network according to the traffic load in the network (i.e switching them on and off).

a. The RRHs has two states, it could be activated or deactivated

b. The BBUs has three states, it could be activated or deactivated or be idle

Methodology:

1- Interested to do this by using markov decision process as done before in the two reference paper attached to the project named:

a. “Energy Efficiency Benefits of RAN-as-a-Service Concept for a Cloud-Based 5G Mobile Network Infrastructure” in section V to switch on and off RRHs.

b. “Economic Framework for Resource Management in Data Center” switch on and off servers in data centers.

Things to be considered:

1- This project will be mixed with a load balancing algorithm between BBUs and RRHs.

a. An idea about load balancing algorithm is found in paper named “ Quality of Service Aware Dynamic BBU-RRH Mapping based on load prediction using Markov model in C-RAN”

Electrical Engineering Matlab and Mathematica Telecommunications Engineering Wireless

Project ID: #18202515

About the project

2 proposals Remote project Active 5 years ago

2 freelancers are bidding on average $416 for this job

Euroaccount

Hello there How are you? I am an electrical engineer who has 7+ years of experience in RRH and BBU using C-RAN. I have done similar projects before and I can do your project well with good quality and high speed. I wan More

$555 CAD in 10 days
(22 Reviews)
7.2
saied2017

Hello I'm Mohamed Saeed. MATLAB expert with high experience. I have checked your job description and I'm ready to help you. thanks

$277 CAD in 2 days
(47 Reviews)
5.9