
In Progress
Posted
Paid on delivery
I’m organising the planning phase of a construction project and need three separate Gantt charts built in Microsoft Project. Each chart should break the plan into clear, easy-to-follow sub-activities, showing realistic durations, dependencies, and an accurate critical path. The purpose of having three schedules is to compare different planning scenarios, so the task sequences or resource allocations shouldn’t be identical across the files. Please create the schedules directly in MS Project (2016 or later), then export each one to PDF for quick viewing. Acceptance criteria: • Coherent WBS that covers early-stage construction tasks (think preliminary design, site set-up, permit tracking, early procurement, etc.) but keeps the detail light enough to fit on a single slide. • Predecessor links in place with the critical path automatically highlighted. • Three distinct planning approaches (for example: baseline, fast-track, and resource-constrained) while keeping the overall timeframe within roughly six months. • Deliverables: three .mpp files plus three matching PDFs that open error-free in MS Project 2019. Once the six files arrive and meet the above points, the project is complete.
Project ID: 40675397
27 proposals
Remote project
Active 6 days ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
27 freelancers are bidding on average $21 USD for this job

As an experienced data analyst with a strong background in Excel and Microsoft Office, I can guarantee that I have the skills and capabilities to deliver the three construction planning Gantt charts you require, not just in the format you requested but also meeting all of your stated criteria. My familiarity with web scraping, search, and entry - paired with my proficiency in analyzing and organizing data - puts me in a unique position to deliver perfectly crafted Gantt charts for your project. It's important when considering crucial project details like "realistic durations," "dependencies," and "an accurate critical path" that you have an expert who sees the bigger picture whilst keeping the details concise. This is exactly what I can offer you. Over the years, I've learned to create data visuals that are both comprehensive and understandable - precisely what you need. In conclusion, selecting me for this project guarantees you a dedicated professional capable of meticulously implementing distinct planning approaches while adhering to your timeframe. Beyond simply creating clear Gantt charts, I'll keep an open line of communication with you, providing consistent updates throughout our collaboration. Let me help bring clarity and efficiency to your construction project through my data management skills. Looking forward to assisting you!
$29 USD in 1 day
7.6
7.6

Hi, I can create the three distinct construction planning schedules in Microsoft Project, with realistic durations, dependencies, WBS structure, and automatically calculated critical paths. I hold a PhD in Strategic Management, a Bachelor’s degree in Commerce, and a Diploma in Project Management, with experience in project planning, scheduling, and structured project documentation. I can develop three scenarios: • Baseline schedule • Fast-track schedule with logical overlaps • Resource-constrained schedule with adjusted sequencing/allocation Each schedule will include preliminary design, permits, site setup, early procurement, and other appropriate early-stage activities while keeping the detail concise enough for presentation. Deliverables: • Three editable .mpp files compatible with MS Project 2016+ • Three matching PDF exports • Linked predecessors and successors • Realistic durations and dependencies • Automatically identified critical path • Distinct planning logic for each scenario • Overall timeframe maintained at approximately six months I will build the schedules directly in MS Project and verify the files before delivery to ensure they open correctly and the Gantt logic is intact. I’m available to start immediately. Kindly consider me, thank you.
$20 USD in 1 day
7.2
7.2

Hello, I fully understand your needs, as I have previously worked on a project similar to your specifications. I am an experienced architect specializing in 3D design and rendering. I have extensive experience using AutoCAD, SketchUp, and Revit 2025, and I can deliver the required design drawings on time. I would be delighted to work on your project. I have carefully reviewed your project details. If you choose me, your project will be completed quickly and to a high standard. Thank you for your interest.
$15 USD in 1 day
5.6
5.6

My strong educational background and extensive experience in building architecture make me an ideal fit for your project. With a flair for detailed planning, I'm adept at utilizing Microsoft Project (2016 and later). I can create three distinct Gantt charts that not only showcase realistic durations but also incorporate accurate critical paths and dependencies. One of my key strengths is an ability to comprehend and execute complex projects with ease. Therefore, I have no doubts that I can deliver you three Gantt charts which represent different planning scenarios while suiting the overall timeframe of about six months. Additionally, I'm well-versed in task sequencing and resource allocations, so you can rest assured that there won't be any repetitive patterns across the files. I understand the importance of consistency - which is why I guarantee coherent Work Breakdown Structure (WBS) that covers early-stage construction tasks without overwhelming the detail. Moreover, meeting all the project specifications accurately has always been my priority - thus you will receive three .mpp files along with respective PDF exports that open error-free in MS Project 2019. Proactive communication and top-notch deliverables ensure successful project completion, and as your architect on this task, I promise to exceed your expectations.
$25 USD in 1 day
5.5
5.5

Hi I am a structural engineer and I can prepare your construction gantt chart base on your requirements. I have done similar recently and I can do this. It would be professional. Let talk about the scope. Looking forward. Thank
$20 USD in 7 days
4.4
4.4

Hi , Your project caught my attention because it directly aligns with my core expertise in Three Construction Planning Gantt Charts. Here is what I bring to the table for your project: ✅ Immediate Start: Ready to dive in right away. ✅ Quality First: I don't stop until you are completely satisfied with the final result. ✅ Relevant Experience: I’ve successfully delivered similar projects with high accuracy and clean execution. Let’s jump on a quick chat to discuss your requirements in detail. When is a good time for you? Regards, Muhammad Asim Khan
$10 USD in 1 day
3.9
3.9

Three scenarios within roughly six months means the schedules need to differ meaningfully while still remaining logically achievable. I’ll build all three directly in MS Project 2016+, using a clean WBS for design, permits, site setup, procurement and other early-stage activities. I’ll establish realistic durations, predecessor relationships and constraints, then validate each schedule’s logic and automatically calculated critical path. I’ll create distinct baseline, fast-track and resource-constrained approaches rather than simply duplicating the same sequence. Finally, I’ll test the files for compatibility with MS Project 2019 and export matching, presentation-ready PDFs. Would you like me to start from your existing activity list or build the WBS from scratch?
$30 USD in 7 days
3.2
3.2

With over a decade in HR and recruitment, I've honed my Excel skills to perfection, which makes me the ideal candidate for your construction planning project. I've successfully built complex dashboards, managed extensive data sets, and designed custom solutions for various business needs. My proficiency in Microsoft Office includes MS Project, making it easy for me to create comprehensive Gantt charts that align with your nuanced requirements. Additionally, partnering remotely with an Australian recruitment agency recently has allowed me to gain hands-on experience that further complements my already diverse HR background encompassing NGO, FMCG, and consultancy sectors. This unique blend of skills equip me with a deep understanding of project management aspects across varying industries, which will be an invaluable asset in producing three distinct but time-efficient planning scenarios while maintaining coherence within six months - just as you need. My dedication to accuracy and deadlines primes me for the meticulous task of ensuring each sub-activity and dependency while keeping tasks on schedule and highlighting the critical path. To view these layouts quickly and error-free as PDFs in MS Project 2019 is no issue at all; it’s what I live to do! Let’s team up to ensure your construction project planning goes smoothly from the preliminary design stages right through to early procurement; raise a red flag ASAP to let's talk!
$20 USD in 7 days
3.4
3.4

Hello, The key challenge is turning the Excel outline into three genuinely different construction schedules while keeping each scenario realistic, coordinated, and within the six-month timeframe. I’d build the three schedules directly in MS Project with a clean WBS, realistic durations, predecessor links, and automatically calculated critical paths. I’d structure them as baseline, fast-track, and resource-constrained scenarios, then export matching PDFs and verify the .mpp files in MS Project 2019. Can you send the Excel outline and confirm the planned project start date?
$15 USD in 1 day
2.5
2.5

Hi, I have the planning experience and Microsoft Project workflow needed to create three clear, reliable construction schedules from your planning requirements. I’ll build each schedule directly in MS Project with a practical WBS, realistic durations, logical dependencies, automatic critical-path highlighting, and a layout that remains easy to review on one slide. Rather than making minor copies, I’ll develop three genuinely different scenarios: baseline, fast-track, and resource-constrained. Each will use distinct sequencing or resource assumptions while staying within the approximate six-month timeframe. You’ll receive three clean .mpp files compatible with MS Project 2019, plus matching PDF exports checked against the source schedules. Two quick questions: Do you have target milestone dates, working calendars, or assumed project start dates? Should resource constraints be based on a specific crew/equipment list, or should I develop reasonable assumptions? Let’s discuss your project now!
$30 USD in 2 days
1.6
1.6

Hello, I reviewed your construction planning requirements, and the real challenge is making the three schedules genuinely distinct while keeping each WBS coherent, dependencies logical, and the critical path meaningful across the same overall planning window. I would structure the early stage activities with clear predecessor relationships and develop separate baseline, fast track, and resource constrained scenarios so the differences come from actual sequencing and resource logic rather than simply changing task dates. I have worked on similar construction scheduling and Microsoft Project planning assignments and can share relevant examples once we connect in chat.
$15 USD in 1 day
1.3
1.3

I will create three distinct six-month early construction schedules directly in MS Project. Each will feature a clean WBS (design, permits, site setup) tailored to a specific strategy: Baseline, Fast-Track, and Resource-Constrained. You will receive three fully linked .mpp files and three matching PDFs with highlighted critical paths.
$40 USD in 5 days
0.6
0.6

Hi, I can create three distinct MS Project schedules with a clear WBS, realistic durations, dependencies, and automatically identified critical paths while keeping each scenario within the six-month timeframe. I’ll make the baseline, fast-track, and resource-constrained plans meaningfully different, then provide the matching PDFs alongside the .mpp files. With 8+ years of experience in project planning, scheduling, and professional documentation, I can deliver clean, easy-to-review schedules that open properly in MS Project 2019. Past work: https://www.freelancer.com/u/ShariqLadhani Shariq
$15 USD in 2 days
0.0
0.0

Hello, I reviewed your Microsoft Project requirements, and the core challenge is creating three genuinely different construction planning scenarios while maintaining a coherent WBS, realistic dependencies, and meaningful critical paths. I would structure the schedules around preliminary design, site setup, permitting, procurement, and other early construction activities, then develop baseline, fast track, and resource constrained approaches with appropriate predecessor relationships. Each schedule would be built directly in Microsoft Project with automatic critical path identification, clear task hierarchy, and a clean presentation suitable for quick PDF review. I have worked on similar construction scheduling, WBS development, MS Project, dependency mapping, and critical path planning projects and can share relevant samples once we connect in chat. Also a quick question, do you have a preferred construction sequence or resource assumptions that should differentiate the three planning scenarios? Regards, MadTech
$10 USD in 1 day
3.9
3.9

Hello, I will deliver three MS Project schedules (.mpp) plus matching PDFs that clearly show a coherent WBS, predecessor links, and the critical path for each planning scenario within a roughly six-month timeframe. My main risk to address up front is over-detailing the WBS: too many tasks makes a single-slide view unreadable and obscures the true critical path. I will keep sub-activities concise while preserving realistic durations and dependencies. I have produced dozens of early-stage construction schedules in MS Project 2016/2019 for site set-up, permit tracking, early procurement and preliminary design, including alternative scenarios for compressed and resource-limited timelines. In past engagements I created baseline, fast-track and resource-constrained files that exported cleanly to PDF and opened error-free in MS Project 2019. I will apply that practical experience to ensure compatibility and clear visualization of the critical path. I will begin by building a light WBS that fits on one slide, enter realistic task durations, link predecessors to expose the critical path, apply resource constraints where required, then save three distinct .mpp files (baseline, fast-track, resource-constrained) and export each to PDF for quick review. - Do you prefer specific work breakdown headings (for example: Design, Approvals, Site Set-up, Procurement, Early Works) or shall I use a standard early-stage template? - Are there any fixed dates or immovable milestones I must respect (site handover, permit expiry, funding windows) when setting constraints? Sincerely, Christopher
$20 USD in 1 day
0.0
0.0

Your three schedules should not simply be copies of each other—they need to clearly show different planning strategies while remaining realistic and easy to review. Hi, I can create the **three Microsoft Project Gantt schedules** for your construction planning phase, with a clear WBS, realistic task duration, logical predecessor relationships, and an automatically identified critical path. I’ll structure the early-stage activities such as **preliminary design, site setup, permits, procurement, and related preparation tasks** while keeping the level of detail concise enough for clear presentation. For the three scenarios, I’ll create distinct approaches: • **Baseline** – balanced and realistic sequence • **Fast-track** – overlapping suitable activities to shorten the schedule • **Resource-constrained** – adjusted sequencing based on limited resources I’ll keep each schedule within the requested **roughly six-month time frame** and ensure the predecessor links and critical path are properly configured. You will receive: ✔ 3 Microsoft Project (.mpp) files ✔ 3 matching PDF exports ✔ Clear, organized Gantt charts ✔ Files prepared for compatibility with Microsoft Project 2019 I’m detail-oriented, comfortable with Microsoft Office and project planning, and I’ll make sure the final schedules are clean, logical, and easy to understand. I’m ready to start and can deliver the complete set within the agreed timeframe. Best regards, Hooria
$10 USD in 2 days
0.0
0.0

Hi, I understand you are not looking for just a visual Gantt chart. You need three realistic construction planning scenarios that can help compare different approaches before starting the project. I will create: • Baseline schedule with a normal construction planning approach • Fast-track schedule with optimized task sequence • Resource-constrained schedule with practical limitations Each schedule will include a clear WBS, realistic activity durations, proper dependencies, predecessor links and critical path highlighting. You will receive: ✓ 3 editable MS Project files (.mpp) ✓ 3 matching PDF exports ✓ Clean layout suitable for presentation ✓ Files compatible with MS Project 2019 My focus will be on creating schedules that look practical and follow real project planning logic, not just filling tasks randomly. I can start immediately and deliver within 3 days.
$20 USD in 3 days
0.0
0.0

Hello sir project management Ms project and primevera P6 ewxpert here, to create a wbs gantt chart resources and dashboards for a planning and sceduling a task. 3 years Hands on experience lets connect i can complete its with in 24 hours. thanks
$30 USD in 1 day
0.0
0.0

I recently helped a construction firm streamline their project planning with tailored Gantt charts in Microsoft Project. I can develop three distinct Gantt charts that break down your construction tasks into clear, user-friendly sub-activities, ensuring a seamless comparison of different planning scenarios. A free consultation will get us started immediately. I understand you need coherent WBS covering tasks like preliminary design and site setup while keeping it light for presentation. With my expertise in project management and Gantt chart creation, I can begin right away and deliver a quick action plan that meets your criteria. What specific planning scenarios do you want to explore in the charts? Regards, Quinlann.
$15 USD in 7 days
0.0
0.0

I am a PMP-certified Senior Planner and Civil Engineer with 10+ years of construction planning and scheduling experience, with advanced expertise in Microsoft Project and Primavera P6. I can develop the three required **MS Project schedules—Baseline, Fast-Track and Resource-Constrained—**with coherent WBS structures, realistic durations, properly linked predecessors, resource considerations and clearly calculated critical paths, all within the required six-month timeframe. My experience covers tender, baseline, construction, recovery and impacted programmes across building and infrastructure projects. I also hold an LL.M. in Construction Law from the University of Melbourne, giving me a strong understanding of programme logic, contractual milestones and schedule risk. You will receive 3 fully editable .MPP files plus 3 matching PDF Gantt charts, professionally structured and ready for presentation.
$25 USD in 2 days
0.0
0.0

Mumbai, United Arab Emirates
Payment method verified
Member since Sep 16, 2018
₹100-400 INR / hour
₹600-1500 INR
₹600-1500 INR
$10-30 USD
$10-30 USD
$3000-5000 USD
$1500-3000 USD
$2-8 USD / hour
$5000-10000 USD
$30-250 USD
₹12500-37500 INR
$1500-3000 USD
min €36 EUR / hour
$10-30 USD
$30-250 USD
$250-750 USD
$125-250 USD
$40-45 USD
$20000-50000 USD
₹600-1500 INR
min $50 USD / hour
min $50 USD / hour
$10-600 USD
$750-1500 USD
$1500-3000 USD