Data will be provided by a MongoDB database called myDB and a collection called theCol. Five fields will be provided: “theDate”, “river”, “up”, “dn”, and “dir”. Additionally, an image file will be provided to be displayed on the page which will be labeled according to the date it corresponds to. The date format will be ‘yyyy-mm-dd’.
To generate the charts seen above, note that for each river“up” and “dn” will both be between 0 and 1 and “up” and “dn” will sum to 1. That is, up + dn = 1 where 0 <= up <= 1 and 0 <= dn <= 1. Then, the green region above represents “up” as a fraction of 1 and the red region above represents “dn” as a fraction of 1. For example, if “up” is 0.8, then 80% of the bar will green and 20% of the bar will be red.
The user should be able to specify up to 5 tickers that they want to display in the top left portion of the screen under the heading “Following”. The top left portion of the page will allow the user tab between selecting tickers to follow and displaying the barcharts for the selected tickers.
The bottom left portion will display the normalized bar charts for the rivers with the five highest values of “up” for the given date under the heading “Top 5 Probability Up”. Similarly, the bottom right portion of the page will display the normalized bar charts for the river with the five highest values of “dn” for the given date under the heading “Top 5 Probability Down”.
The top right portion of the page will display the supplied image file in the following name format yyyymmdd_FA.jpg. Please refer to attached document for further details of the graphics
Hi i can do this job, you can check my profile and the feedbacks provided by other Employers, i will provide a clear and transparent communication, also i have test servers (vps) and domains for the continuous revision of the job.
$100 USD in 5 days
5.0 (20 reviews)
5.0
5.0
4 freelancers are bidding on average $101 USD for this job
Hi,
I am interested in the project but I can't seem to understand the top left region "Following".
also how can the user choose the number of rivers or its always 5?
who will generate the provided image on the top right panel?
my bid is not final yet, might be higher or lower depending on the full requirements I will get from your.
Looking forward to your input.
Best Regards,
Ebson